Ducting Installation

Eleclink, Folkestone

First installation of EHV cable in a live underwater rail tunnel.

Location

Kent, UK

Client

ElecLink, Groupe EuroTunnel

Main Contractor

Balfour Beatty

Value

£2.2m

Challenges and Solutions:

Access to the EuroTunnel site required security vetting and clearance, limiting the number of personnel available to work on site.

Robust planning was required in relation to deliveries as third parties were not authorised past the main entrance.

Maximum traffic management closure length of 100m was in place requiring methodical programming.

Where the main ducts crossed under an existing service a clearance of 300mm was required resulting in excavation depths of over 2.0m.

A mixture of traditional trench boxes and lightweight shoring were used to ensure the trench was supported and productivity on site was maintained.

Scope of the project:

blu-3 undertook works to install ducting for the ElecLink project.

  • Traffic management
  • Excavation
  • Placing ducts
  • 3,200m HV cable
  • 2,100m ECC
  • 1,050m Fibre
  • 1,050m DTS
  • Reinstatement