blu-3 has exceeded expectations on Chelsea Barracks offering a finished product of the highest quality
Russell Hill, Construction Director, Mace Group Plc.
blu-3 offers first-class groundworks and civil engineering services supporting contractors and clients across the UK and Europe. As a highly experienced and trusted supplier, blu-3 builds strong relationships with valued clients, who are at the heart of the business.
Dedicated to key stakeholder management, the blu-3 team brings control, speed and quality to each project and is uniquely positioned with both civils and utilities capabilities under one roof.
As an outstanding provider of hard and soft landscaping, temporary works, earthworks, remediation and site enablement with exceptional workmanship, blu-3 is committed to health and safety excellence delivering projects on time, every time, for complete client satisfaction.
Our Civils team is highly knowledgeable, experienced and reliable. We are committed to excellence in delivery and work hard to go over and above in project delivery. Iām proud to lead the Civils team at blu-3.
Richard Hope, Chief Delivery Officer
Location | London, UK |
Client | Sir Robert
McAlpine |
Main Contractor | blu-3 UK Ltd. |
Value & Programme | Ā£4,000,000 – in 44 weeks |
Project Challenges & Solutions:
- Long procurement lead times meantĀ the work had to be completed quicklyĀ while maintaining high standardsĀ
- Maintaining access to Liverpool StreetĀ station while the project was ongoing
Scope:
- Initial design works to enable restĀ of project to startĀ
- Hard landscaping, drainage installationĀ and the erection of vehicleĀ protection barriers
Location | Bracknell, Berkshire |
Main Contractor | Mace |
Value | Ā£10.5M |
Project Challenges & Solutions:
- >500,000 injury free man hoursĀ
- 17,000mĀ² granite paving laidĀ
- 2km of ducting installedĀ
- >3,000 m3 concrete placedĀ
- >1km of slot drain installedĀ
- 2,000mĀ² resin bound surfacingĀ
- Nearly 600 chambers installedĀ
Scope:
- Installation of foul and surface waterĀ drainage to tie into existing systemsĀ
- Temporary works design toĀ
- accommodate underground servicesĀ adjacent to worksĀ
- Construction of 3 sets of stepsĀ including āamphitheatre stepsāĀ
- Installation of street lighting, benches,Ā litter bins, cycle racks, bollardsĀ and plantersĀ
Location | SW1, London |
Client | Land Securities |
Main Contractor | blu-3 UK Ltd. |
Value | Ā£15M |
blu-3 acted as principal contractor for the client at multiple phases of the project Delivering the works in exceptionally tight timeframes with uncompromising programmes
Scope:
- Design & BuildĀ
- Delivering site wide enablingĀ
- Multi utility disconnectionsĀ & coordinationsĀ
- Site wide traffic management throughĀ Transport for London (TFL) &Ā Westminster City Council (WCC)Ā
- Civil engineering works in 3 phasesĀ to improve transport in LondonĀ
Delivering the works in exceptionally tight timeframes with uncompromising programmesĀ