Moorfields was a challenging project for the blu-3 team that required it to use innovative solutions to overcome many hurdles. The two-phase scheme saw blu-3 carry out utility works in a highly congested area without causing any disruption.
Location
Client
Main Contractor
McAlpine
Value
Demolition, site clearance and civils works in a busy and congested area
Project Challenges
Keeping noise and vibration disruption to the operation of the LUL station, the residents and offices to a minimum
• Working on an existing building less than 300mm above the ceiling of Moorgate station
The use of out of hours gangs, alternative methods (drill & Burst and Hydro-demolition) and inventive temporary works and access solutions
Scope
The demolition, movement joints and installation of reinforced concrete works around the new piles
Deck strengthening of works and new power, water and communications connections to the development