Successful blu-3 completion led to more contracts being awarded.
Location
London, UK
Client
Transport for London
Main Contractor
Skanska
Value
£1.2m
Challenges and Solutions:
- The bridge was at the end of its operational life and had significant safety issues to be addressed
- Road blocker had to be removed as it had been installed by Hochtief
- Complex interfaces with Network Rail, utility companies, TFL roads and local residents
- • Size and depth of excavations
- • Working on a live traffic road as the other side of the bridge was still in use
Scope of the project:
- The scope of this project was to carry out utilities works associated with the replacement of A1 Upper Holloway Road over railway bridge scheme
- Diversionary utility works for installation of new bridge Divert 2 way 100mm duct with fibre optic cables into the new service bridge
- The construction of two new footway chambers to intercept existing duct route in footway